loose construction

英 [luːs kənˈstrʌkʃn] 美 [luːs kənˈstrʌkʃn]

结构松散(句)

法律



双语例句

  1. Good SOA principles dictate loose coupling and tightly-defined service interfaces, so the rest of your construction should be dictated by these interfaces.
    好的SOA原则一般要求松散耦合和严格定义的服务界面,因此您的其余创建应该受这些界面的约束。
  2. Testing and judgment of surrounding rock loose zone of tunnel engineering is very important for construction supporting design in the tunnel construction period.
    隧道工程施工期围岩松动圈的测试与判定,对于施工支护设计具有重要作用。
  3. Construction Measures of Hole Drilling of Prestressed Cable in Loose Deposit Application of self-made scarifier anchorage boring in construction
    松散堆积体预应力锚索钻孔施工措施自制松土齿在锚孔钻造成孔施工中的运用
  4. To settle loose bed, quick sand and ingress of groundwater are trouble some problems during coalmine construction.
    如何解决煤矿建井中的松散层、流沙和地下渗(涌)水是目前建井工程中的棘手问题。
  5. In recent years, granular cellulose fiber for road construction is considered for engineering of practice gender which substitute gradualness loose cellulose for road construction.
    近年来,从工程实际操作性来考虑,松散状路用木质素纤维逐渐被颗粒状路用木质素纤维所替代。
  6. The SCRUM methodology embodies these general, loose controls, using OO techniques for the actual construction of deliverables.
    在使用面向对象技术来构建实际的可发行软件过程中,SCRUM方法包括了一般化和松散的控制。
  7. The research results indicate that the top inclined fault and the loose rock strata and the unreasonable construction project are the main causes to induce these defects.
    研究结果表明:连拱隧道内侧断裂带、上方松散层等不良地质条件和不合理的施工方案是导致隧道衬砌严重破坏和山体地表开裂的主要原因。
  8. Stability analysis and monitoring for tunnel in loose soils during construction
    崩塌松散围岩隧道施工稳定分析与监控
  9. Combined pile ( raft) foundation is a kind of loose pile foundation with the feature of loosely arranged piles. Compared with the traditional pile foundation the construction cost of combined pile foundation is lowered in large amount and it is the trend of development for pile foundation.
    协力桩(筏)基础是疏桩基础的一种,它的特点是桩稀疏布置,因此和传统桩基相比较可大幅度降低基础工程的造价,是桩基发展的一种趋势。
  10. The eolian sand is loose, and not stable particularly at steep slope zone where construction of dug piles is extremely difficult and there are even no ripe experiences to go by.
    风积砂土体松散,在陡坡处更不稳定,在此条件下进行挖孔桩施工成孔极难,没有成熟施工方法。
  11. The Exploration of Loose High Gas Thick Coal Seam Quick Construction Method
    松散高瓦斯厚煤层快速施工方法的探讨
  12. The reasons caused the boulders in loose blasting and technical measures to increase fragmentation ratio are discussed in order to realize the application of loose controlled blasting in construction work of rock filled embankment.
    论述了松动爆破大块、根底产生原因以及提高破碎质量的技术措施,达到将松动控制爆破与爆破块度满足填石路堤要求有机结合的目的。
  13. The results show that the way with performance of granular cellulose fiber for road construction is obviously superiority than loose cellulose fiber for road construction.
    本研究选用颗粒状路用木质纤维和松散状路用木质纤维进行路用性能试验,试验结果表明,颗粒状路用木质纤维较松散状路用木质纤维在路用性能上有明显优势。
  14. Nude loose soils, river beds and floodplain fine alluvium, sand-dust of city construction sites and so on in the urban expansion areas of Harbin may all be main material sources of sand and dust fall-outs of Harbin.
    哈尔滨城市扩展区域的疏松地表裸土、河床及漫滩细粒冲积物以及市内地表建筑沙土等都可以是哈尔滨市沙尘沉降物的主要物源。
  15. The temperature of the items with loose construction or high original temperature increased quickly.
    在试验范围内,物品温度与预热时间呈正相关,材料结构疏松或原温度较高的物品升温较快。
  16. In this paper technique of the chamber loose blasting design and construction of the roadbed from Yuncheng to Sanmenxia ( K16+ 840-K17+ 600) is introduced, mostly about how to control the blasting damage area and the blasting effect in the ridge.
    介绍了运城至三门峡K16+840~K17+600段山脊地形深路堑硐室松动爆破控制边坡破坏范围和爆破破碎效果等方面的设计与施工经验。
  17. Because the surface dry silty sand layer is thick and loose, it is general think that its bad compaction ability and low shear strength are the important factors restraining the desert petroleum engineering construction.
    由于沙漠表面的干粉砂层厚且松散,一般认为其压实性能差、抗剪强度低,是制约沙漠石油工程建设的重要因素。
  18. Besides, making comparison of different method to test the loose situation of tunnel rock during construction, these methods contain acoustic method, multi-point displacement meter method and ground penetrating radar method.
    并对声波法、多点位移计及地质雷达对施工过程中隧道围岩松动范围的测试结果进行了对比分析。
  19. Firstly, aiming at the disadvantage factors such as great length, thin earth covering, loose aquiferous ground, and strict requirement for settlement, construction technique of Underpass Bridge jacking is introduced in detail.
    首先针对地道桥顶进长度大、覆土厚度薄、地层软弱、地面沉降控制要求严等不利因素,详细介绍了地道桥顶进的施工技术。